Products
Home / Products / Jet Ski Impeller / Replacement Sea-Doo / Jetman Impeller 159MM OEM No. S-TP-15/21A Stainless Steel Jet Ski Impellers Replacement for Sea-doo Performance Use RXT IS 260

CONTACT US

Water Sports Group Ltd, No. 63, Haier Road, Laoshan District, Qingdao City, Shandong Province, China
Tel:  +86 17852272991
PRODUCT INQUIRY

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Jetman Impeller 159MM OEM No. S-TP-15/21A Stainless Steel Jet Ski Impellers Replacement for Sea-doo Performance Use RXT IS 260

Applications

RXT IS 260 (2009-New)
 

 

 

 

 
OEM:
Diameter:
Blades:
Material:
Surface Treatment:
Origin:
Packaging:
Availability:
Quantity:
  • S-TP-15/21A

  • Jetman

  • 8487100000

Jetman Impeller 159MM OEM No. S-TP-15/21A Stainless Steel Jet Ski Impellers Replacement for Sea-doo Performance Use RXT IS 260

Payment: T/T, West Union, PayPal, L/C

Min Order: 120pcs

Sales Modesl: Wholesale

Delivery Time: 15-30 days

Certification approved: CCS,BV,DNV,NK,ABS,GL,SGS ,etc

Warranty: 1 Year


Product Show

07

Production

In Stock - Jetman Impeller (1)_副本

Sample Diaplay

Jetman Impeller Show

Metal Spectral Analysis

Jetman Impeller JetJetman Impeller Jet Ski

Impeller Roundness Profile Measuring Instrument

Jetman Impeller Jet Ski ImpellerJet Ski Impeller

CMM Systems

CMM Systems (1)

CMM Systems (2)

Dynamic Balance Test Show

Dynamic Balance Test Show (1)

Dynamic Balance Test Show (2)

FAQ:

- Are you a manufacturer?
JETMAN was founded in 2010. We are located in Qingdao of China and offers a wide range of jet ski impeller and jet ski parts. So far we have exported to 37 countries and regions. We are the largest manufacturer and exporter of jet ski impellers and spare parts in China.

- What is the lead time for the general production order?

The lead time varies according to the quantity, normally between 7-10 days.
- How many engineers are there in your R & D department?
There are more than 8 experienced engineers in my company, in which there are 3 of them are working in R & D department.
- How many days will a new development item need?
Usually, we will prepare the molds and counter samples for a general part in 30-35days.
- What is the lead time for the general production order?
About 1 months according to the quantities.
- What's your advantages?

1. 100% factory supply: ensure both costs and quality.

2. Wide range categories: Jet Ski Impeller, Outboard Jet Impeller, Outboard Propeller and all kinds of Jet ski Spare Parts.

3. Rich experiences: we have been supplying to 100+ global markets for over 13 years with good quality.  We are you one-stop import consultant.

4. Best location: Located in Qingdao, there are 1 hour driving from our company to Qingdao port and  30minutes to Airport.
- Will you ask for sample charge?
We will ask for sample fee in advance and refund once you place a formal order.
- What's the payment term?

100% T/T  delivery. We'll show you the photos of the products and packages before you pay the balance.

 


Previous: 
Next: 

Jetman Impeller - we are professional jet ski impeller manufacturer and exporter in China.

QUICK LINKS

PRODUCTS

CONTACT US

No. 63, Haier Road, Laoshan District, Qingdao City, Shandong Province, China
  +86 18852536316
​Copyright ©2024 Jetman Impeller. All rights reserved    Sitemap Support By Leadong.